Back to projectsPROJECT PROFILE

Al Rifai Mining Company Project

LOCATIONSudan (Northern State)PERIOD2023 – 2024
PROJECT GALLERY

PROJECT IMAGES

Visual placeholder until project photos are supplied by the company.

THE PROJECT

SCOPE OF WORK

Integrated two-line CIC plant with four processing vats, manufactured core equipment, and a supplied and installed Electro-winning Cell.

Scope of work: Design and construction of an integrated CIC gold processing and recovery plant with two separate production lines to current engineering specifications, including:
• Design and construction of four Processing Vats distributed across the two lines.
• Design and manufacture of high-efficiency Carbon Columns.
• An integrated connection network linking the production lines and processing stages.
• Supply and installation of the Electro-winning Cell.
• Design and manufacture of the Smelting Furnace for gold refining and smelting, followed by successful, high-efficiency trial commissioning of both lines.

SELLTECH'S ROLE

Design and construction of a two-line CIC plant; manufacture of carbon columns and furnace; supply and installation of the electrical cell.