PROJECT IMAGES
Visual placeholder until project photos are supplied by the company.
Muzn Mining Company Project
Images pending. The artwork shown is a neutral placeholder.
SCOPE OF WORK
Integrated CIC production line operated and managed by SELLTECH, with processing vats, manufactured equipment, and a successful trial run.
Scope of work: Design, construction, and operation of an integrated CIC gold processing and recovery production line, including:
• Full operation and management: SELLTECH became the project's Plant Operator, with its engineering teams fully managing and operating the plant and recovery processes.
• Design and construction of Processing Vats.
• Design and manufacture of high-efficiency Carbon Columns.
• An integrated connection network linking production lines and processing stages.
• Supply and installation of the Electro-winning Cell.
• Design and manufacture of the Smelting Furnace for final refining, followed by a trial production run that demonstrated the efficiency of the entire line.
CIC line design, construction, and operation, with plant management, equipment manufacture, and electrical cell supply and installation.
